top of page
Catedral%2005_edited.jpg

PORTFOLIO

Insights for your project

CASE 1

CARLOS GOMES THEATER

!

STATISTICS

BENEFITS ACHIEVED

TIME IN FIELD:
- External: 1 day.
- Internal: 4 days.

DEADLINE:
10 working days.

PROJECT'S GOAL:
Documentary memory.

POSSIBLE USES:
- Digital collection;
- Restoration project;
- Monitoring of pathological manifestations.

MINIMIZED RISKS:
- Lack of documentary record of architectural features;
- Accidents / claims resulting from the lack of inspection;
- Errors in the documentation due to failure to read measurements or to register them;
- Work accidents resulting from access to dangerous environments, such as capturing high details;
- Loss of historical information in the event of accidents.

OPPORTUNITIES CREATED:
- Implementation of restoration / repair of the structure;
- Asset Management;
- Digitization of elements, furniture, objects and / or historical structures;
- Risk analysis of damage to historical heritage, anticipating problems and acting preventively.

C01: CARLOS GOMES THEATER

CASE 2

DAM

!

BENEFITS ACHIEVED

STATISTICS

TIME IN FIELD:
1 day.

DEADLINE:
3 working days.

PROJECT'S GOAL:
Structural reinforcement project.

POSSIBLE USES:
- Monitoring of pathological manifestations;
- Simulations of scenarios;
- As found.

MINIMIZED RISKS:
- Accidents / claims resulting from the lack of inspection;
- Document registration errors inherent to traditional measurement processes;
- Insufficient and / or inaccurate information raised;
- Exposure in an environment at risk of accidents.

OPPORTUNITIES CREATED:
- Analysis of pathological manifestations;
- Urbanization studies;
- Project for reforms and extensions.


C02: DAM

CASE 3

SMART HOUSE

!

STATISTICS

BENEFITS ACHIEVED

TIME IN FIELD:
1/2 day.

DEADLINE:
3 working days.

PROJECT'S GOAL:
As is.

POSSIBLE USES:
- Renovation project;
- Monitoring of pathological manifestations;
- Simulations of scenarios;
- Modeling of existing structures;
- 4D planning.

MINIMIZED RISKS:
- Document registration errors inherent to traditional measurement processes;
- Insufficient and / or inaccurate information raised;
- Project incompatibilities due to the use of different sources of survey data.

OPPORTUNITIES CREATED:
- Risk analysis of damage to the building, anticipating problems and acting preventively;
- Construction planning considering the construction site;
- Digital simulations of equipment entering the environment, providing for necessary interventions;
- Sharing information with all project investors.

C03: SMART HOUSE

CASE 4

PLAST PET

!

STATISTICS

TIME IN FIELD:
1 day.

DEADLINE:
3 working days.

PROJECT'S GOAL:
Manufacturing layout.

POSSIBLE USES:
- Simulations of scenarios;
- Study of critical path;
- 4D planning;
- Asset Management.

BENEFITS ACHIEVED

MINIMIZED RISKS:
- Document registration errors inherent to traditional measurement processes;
- Exposure in an environment with a high risk of accidents;
- Insufficient and / or inaccurate information raised;
- Mistaken acquisition of logistics equipment;
- Production shutdown due to incompatibilities of the layout change project.

OPPORTUNITIES CREATED:
- Asset Management;
- Machinery exchange studies and simulations;
- Analysis of the work environment for accident prevention;
- Replication of the production line in another environment;
- Study of factory layout.


C04: PLAST PET

CASE 5

IRON BRIDGE

!

STATISTICS

TIME IN FIELD:
2 days.

DEADLINE:
5 working days.

PROJECT'S GOAL:
As is.

POSSIBLE USES:
- Renovation project;
- Monitoring of pathological manifestations;
- Modeling of existing structures;
- 4D planning.

BENEFITS ACHIEVED

MINIMIZED RISKS:
- Document registration errors inherent to traditional measurement processes;
- Insufficient and / or inaccurate information raised;
- Exposure to risk in the measurement of difficult to access places;
- Conflicts and unforeseen circumstances in the execution of reforms and expansions;
- Loss of historical information in the event of accidents.

OPPORTUNITIES CREATED:
- Digitization of a historic and emblematic monument for the city;
- Feasibility study and reform project;
- Structural analysis of historical heritage, anticipating problems and acting preventively;
- Budget estimate in different intervention scenarios;
- Urban planning.

C05: IRON BRIDGE

CASE 6

STONE CATHEDRAL

!

STATISTICS

TIME IN FIELD:
1 day.

DEADLINE:
5 working days.

PROJECT'S GOAL:
3D printing.

POSSIBLE USES:
- Retrofit / Restoration project;
- 4D planning;
- Model of existing structures;
- Neighborhood Impact.

BENEFITS ACHIEVED

MINIMIZED RISKS:
- Document registration errors inherent to traditional measurement processes;
- Exposure to risk in the measurement of difficult to access places;
- Loss of historical information in the event of accidents;
- Insufficient and / or inaccurate information raised;
- Conflicts and contingencies in the execution of reforms and expansions.

OPPORTUNITIES CREATED:
- Digitization of a historic and emblematic monument for the city;
- Study and proposal for a renovation and maintenance project;
- Conduct a risk analysis of damage to historical heritage, anticipating problems and acting preventively;
- Urban planning of the region.

C06: STONE CATHEDRAL

CASE 7

RESIDENTIAL BUILDING

!

STATISTICS

TIME IN FIELD:
14 interchanged days.

DEADLINE:
5 working days after scanning.

PROJECT'S GOAL:
As built.

POSSIBLE USES:
- Site layout;
- Project vs Real;
- Quality measurement;
- 4D planning;
- Asset Management.

BENEFITS ACHIEVED

MINIMIZED RISKS:
- Document registration errors inherent to traditional measurement processes;
- Customer dissatisfaction with incomplete and inaccurate As Built;
- Absence of construction records in case of accidents;
- Failures and lack of uniformity in the quality of the work due to lack of control;
- Pathological manifestations due to unidentified construction errors.

OPPORTUNITIES CREATED:
- Creation / update of the BIM model for the life cycle of the enterprise;
- Creation of complete and interactive As Built;
- Construction quality certification;
- Reduced material consumption;
- Validation of contracts with outsourced companies by measuring the quality of the service;
- Inspection of the work virtually;
- Studies and simulations, from the critical path of the construction site to the implantation of equipment and movement of cranes.

C07: RESIDENTIAL BUILDING

CASE 8

SNOWLAND

!

STATISTICS

TIME IN FIELD:
2 days.

DEADLINE:
20 working days.

PROJECT'S GOAL:
3D printing and As is.

POSSIBLE USES:
- Expansion / renovation project;
- 4D planning;
- Model of existing structures;
- Simulation of scenarios;
- Asset Management;
- AR / VR.

BENEFITS ACHIEVED

MINIMIZED RISKS:
- Document registration errors inherent to traditional measurement processes;
- Exposure to risk in the measurement of difficult to access places;
- Loss of architectural information in the event of accidents;
- Delays in the work schedule due to project incompatibilities;
- Review of purchase contracts due to error or failure in the database.

OPPORTUNITIES CREATED:
- Conduct a risk analysis of damage to property, anticipating problems and acting preventively;
- Layout studies and creation of new scenarios;
- Asset Management;
- Studies and simulations of interventions;
- BIM model creation for different uses.

C08: SNOWLAND

CASE 9

APARTMENT

!

STATISTICS

TIME IN FIELD:
2 hours.

DEADLINE:
1 working day.

PROJECT'S GOAL:
As is.

POSSIBLE USES:
- Interior design;
- Project vs Real;
- Quality assessment;
- 4D planning.

BENEFITS ACHIEVED

MINIMIZED RISKS:
- Document registration errors inherent to traditional measurement processes;
- Return of furniture or equipment due to incompatibility of measurements;
- Excessive or scarce acquisition of finishing material;
- Unpredictability of the budget for reform;
- Project incompatibilities due to the use of different sources of survey data.

OPPORTUNITIES CREATED:
- Creation / update of the BIM model for the life cycle of the enterprise;
- Reduced material consumption;
- Validation of contracts with outsourced companies by measuring the quality of the service;
- Simulations of scenarios.

C09: APARTAMENT

CASE 10

TAMANINI HOUSE

!

STATISTICS

TIME IN FIELD:
1/2 day.

DEADLINE:
3 working days.

PROJECT'S GOAL:
As found.

POSSIBLE USES:
- Retrofit / Restoration project;
- Model of existing structures;
- Simulations of scenarios;
- Analysis of pathological manifestations;
- AR / VR.

BENEFITS ACHIEVED

MINIMIZED RISKS:
- Document registration errors inherent to traditional measurement processes;
- Exposure to risk in the measurement of difficult to access places;
- Loss of historical information in the event of accidents;
- Insufficient and / or inaccurate information raised;
- Conflicts and contingencies in the execution of reforms and expansions.

OPPORTUNITIES CREATED:
- Risk analysis of damage to property, anticipating problems and acting preventively;
- Studies and simulations of interventions;
- Renovation and maintenance project;
- Urban planning of the region.

C10: TAMANINI HOUSE

CASE 11

KUNZE SALON

!

STATISTICS

TIME IN FIELD:
2 hours.

DEADLINE:
1 working day.

PROJECT'S GOAL:
As found.

POSSIBLE USES:
- Restoration/Reconstruction project;
- Inspection of pathological manifestations;
- Forensic anlysis;
- 4D planning.

BENEFITS ACHIEVED

MINIMIZED RISKS:
- Loss of historical information in the event of accidents;
- Exposure in an environment with the risk of collapsing;
- Document registration errors inherent to traditional measurement processes;
- Lack of information for reconstruction;
- Insufficient and / or inaccurate information raised;
- Conflicts and contingencies in the execution of reforms and expansions.

OPPORTUNITIES CREATED:
- Implementation of restoration / repair of the structure;
- Risk analysis of damage to historical heritage, anticipating problems and acting preventively;
- Analysis of the structure's behavior in fire situations.

C11: SALÃO KUNZE

CASE 12

BULK CARRIER

!

STATISTICS

TIME IN FIELD:
17 hours.

DEADLINE:
7 working days.

PROJECT'S GOAL:
BWTS.

POSSIBLE USES:
- Replacement of secondary equipment;
- Model of existing structures;
- Scenario simulations;
- Wear analysis.

 

ACHIEVED BENEFITS

MINIMIZED RISKS:
- Errors in document registration inherent to traditional measurement processes;
- Exposure to risk when measuring hard to reach places;
- Insufficient and/or inaccurate information collected;
- Conflicts and unforeseen events in execution;
- Reduction of costs with a ship berthed for a longer time.

CREATED OPPORTUNITIES:
- Studies and simulations of interventions;
- Renovation and maintenance project;
- Asset Management;
- Estimation of maintenance costs for different scenarios.

 

C12: BULK CARRIER
bottom of page